James Robson Building and Design
Quality building work from traditional materials
Thursday, 23 May 2019
Veranda rebuild, Newton St Margarets
An existing veranda was dismantled, a new structure was built running the opposite way with new oak frame and steel guttering. The glass was reused.
Newer Post
Older Post
Home